• <tfoot id="zghua"></tfoot>
    <wbr id="zghua"><span id="zghua"></span></wbr>
    <p id="zghua"><strike id="zghua"></strike></p>
    <tr id="zghua"><td id="zghua"></td></tr>

    久久国模吧,精品人妻一二,丰满的少妇愉情HD高清果冻传媒,人妻在线资源,亚洲精品专区,成人网中文字幕,无码中文幕熟AⅤ一区二区,九九精品视频在线免费观看
    Latest News
    2015/3/21
    Comparison bet
    2015/1/22
    The importance
    2015/1/21
    Troubleshootin
    2014/12/15
    Machinery Exhi
    2014/12/15
    Rayliter Works
    Search
    current position:Home > News > Industry News

    Cold heading machine maintenance needs to know these points

    Source:http://www.yyoucheng.com     Author:冷鐓機     Time:2014/8/19     Click:
        The maintenance and upkeep of a multi station cold heading machine involves general methods such as wiping, cleaning, lubrication, and adjustment to maintain the equipment. Daily maintenance and upkeep of the equipment are the foundation of equipment maintenance, and can only be operated manually. According to the regular inspection card, perform self inspection and mutual inspection, and establish work quotas and material consumption quotas for the regular maintenance of equipment.
    To reduce cracking, the main purpose of developing a multi station automatic cold heading machine at that time was to produce a large number of bullet shells during World War II, and the feeding device should be disconnected first.
    Then, the clamp conveyor mechanism sequentially sends it to the gathering and punching stations for forming, with a capacity of over 300 pieces per minute. Regular maintenance and upkeep of the equipment should be included in the assessment of the workshop contracting responsibility system.
    It is necessary to check the gap between the concave mold clamp and the equipment. The three-level maintenance system is a mandatory maintenance system that focuses on the operator and emphasizes both maintenance and repair. It determines which parts should be cleaned, which parts should be adjusted, and which devices should be inspected.